Building codes are regulations that set out the standards to which buildings and other structures must conform. The International Existing Building Code (IEBC) is a code established in the US by the International Code Council (ICC) and applied by most of the country’s jurisdictions as well as in some other countries internationally, (sometimes amended to reflect local conditions and legislation).
The sets out requirements for repairs, alterations and additions to existing buildings and structures. It applies to work on buildings and structures that were constructed before the introduction of the building code requirements in 2000.
In many cases, the cost of works that would be required to bring a building up to current compliance levels can be prohibitively high. The code provides three options that allow a controlled departure from full compliance with the codes dealing with new construction while at the same time maintaining basic standards for structural performance, fire prevention and other health and safety issues.
The main options provided by the code:
Option 1: Work shall be done in accordance with a Prescriptive Compliance Method. This follows provisions included in the IBC such as the following requirements:
- Existing materials shall be permitted to remain in use unless determined to be unsafe.
- New and replacement materials must conform to the applicable code for new construction.
- The building official has the authority to demand changes or works to be done to eliminate conditions that are deemed dangerous.
- Any additions must comply with the International Building Code (IBC) for new construction.
- Any alterations to the existing building must be such that the building as a whole is no less compliant with the IBC provisions that it was without the alterations.
- The building use or occupancy shall not be changed unless it is made to comply with the IBC.
- Historic buildings that are listed in the National Register of Historic Places do not need to be brought into compliance.
- Structures that are moved must comply with the IBC provisions for new structures.
Option 2: Work shall be done in accordance with a Work Area Compliance Method. This is the most flexible of the three options since specific code provisions are triggered only if the scale and level of work warrant them.
Option 3: Performance method. This is the least used of the three options. It provides the design team with a method of scoring the existing safety conditions of a building. Improvements must then be undertaken to improve the score to an acceptable level.
[edit] Related articles on Designing Buildings Wiki
- Alterations to existing buildings.
- Building codes.
- Building regulations.
- Change of use class.
- International building code (IBC).
- International Code Council ICC.
- International residential code (IRC).
- International Zoning Code (IZC).
- Permitted development.
- Renovation.
- Structural engineering codes.
- The role of codes, standards and approvals in delivering fire safety.
- What approvals are needed before construction begins.
Featured articles and news
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.